All SCCLD libraries will be CLOSED Monday, January 18 for Martin Luther King Jr. Day. All library services will be unavailable.

Walk up and curbside holds pickup services are available (see your library's schedule).  Lobby service has changed to walk up as of Monday, Nov 30.  (Read More)

Limited services are available, including walk up and curbside services.  Virtual programs and library support (Ask Us) are available Mon-Sat (excluding holidays). Some services listed in our website are currently unavailable.  View our list of currently available services

Campbell Library Feasibility Study

Campbell Library Feasibility Study

The purpose of this report is to provide credible cost estimates to correct deficiencies of the current Campbell Library and make cost effective improvements.  The scope of work for the Campbell Library project consists of full renovation to meet fire, seismic, safety codes and functionality requirements. It includes a new exterior envelope, gutting the interior with interior walls reconfigured to provide a more effective library, and site work, as well as new plumbing, electrical, sprinklers, and HVAC systems. New exit/entry ramps that meet ADA standards, as well as a new elevator that meets minimum Building Code requirements is also included.

Campbell Library Feasibility Study 2019

Back to Top